SRV-49 — Gift chest and wheel of fortune

Prize tables, entitlements and server-side draws with stock and budget limits.

FieldDetails
Task codeSRV-49
PhaseP4 — V2 evolutions
Product scopeV2
StatusPlanned
StartMon 15 Mar 2027
DueTue 16 Mar 2027
ResponsibleAnis — Full-stack developer
Co-responsible—
Effort2 person-day(s) planned · 5 from scratch · size M
Area · appServer · server
Depends onSRV-48
UnblocksSRV-50
Milestones—

Summary

Prize tables, entitlements and server-side draws with stock and budget limits.

Description

Change request 04 (client loyalty document and letter of 6 Nov 2026), not yet accepted or priced by HOCO. Builds PrizeTable, PrizeTableEntry and PrizeEntitlement, the entitlements created by qualified events, the server draw with stock and budget, and the expiry of chests and spins. Stays off until the legal check D-61 is closed and the budget D-55 is set.

Subtasks

#SubtaskOwner
1Prize tables with odds, stock and budget, admin.loyalty.prizeTables.crudAnis
2Entitlements from qualified eventsAnis
3Draw in a transaction with a secure random sourceAnis
4Applying each prize typeAnis
5Reversal when the source order is cancelledAnis

Deliverables

  • apps/server/src/modules/loyalty/prizes.service.ts

Acceptance criteria

  • One entitlement gives one draw, even from two devices (LOY-18, LOY-19)
  • A prize without stock or budget is never drawn (LOY-18)
  • No stock or budget number reaches a reseller (BR-99)

Requirements covered

RequirementTitleRelease
LOY-18Gift chest with configured prizes, odds and budgetV2
LOY-19Wheel of fortune, optional, one spin per entitlementV2

API surface

Endpoint groupOperations
Loyalty (V2)23
Promotions & loyalty41

Test measures

  • Statistical test of the odds
  • Concurrency test of opening

Risks

  • Legal check open (D-61): the task may be dropped or changed to fixed prizes

KPI

  • Delivered by Tue 16 Mar 2027 within 2 person-day(s).
  • Every acceptance criterion above demonstrated before hand-off; linked requirements' acceptance criteria pass.
  • Zero open critical defects, permission gaps or data-integrity regressions at sign-off.