QA-04 — Loyalty end-to-end tests (document section 20)

Prove the mandatory cases of the client's document on staging, on web, app and back-office.

FieldDetails
Task codeQA-04
PhaseP4 — V2 evolutions
Product scopeV2
StatusPlanned
StartThu 1 Apr 2027
DueSun 4 Apr 2027
ResponsibleAnis — Full-stack developer
Co-responsibleImad
Effort2 person-day(s) planned · 4 from scratch · size M
Area · appQuality · shared
Depends onWEB-21, MRA-21, SRV-50
Unblocks—
MilestonesV2 delivered

Summary

Prove the mandatory cases of the client's document on staging, on web, app and back-office.

Description

Change request 04 (client loyalty document and letter of 6 Nov 2026), not yet accepted or priced by HOCO. Runs the eleven mandatory cases of document section 20 (LOY-26) end to end, and the checks that the three surfaces show the same data. Extends AT-07. A condition of the V2 delivered milestone.

Subtasks

#SubtaskOwner
1Test data and scripted scenarios for the eleven casesAnis
2Run on the reseller web and the back-officeAnis
3Run on the reseller appImad
4Report with evidence and fixesAnis

Deliverables

  • Loyalty test report on staging

Acceptance criteria

  • All eleven cases of LOY-26 pass on web, app and back-office
  • Each ledger's sum equals its balance after the campaign

Requirements covered

RequirementTitleRelease
LOY-26Mandatory tests before the programme is deliveredV2

API surface

Endpoint groupOperations
Loyalty (V2)23
Promotions & loyalty41

Test measures

  • Playwright e2e suite
  • Flutter integration tests

KPI

  • Delivered by Sun 4 Apr 2027 within 2 person-day(s).
  • Every acceptance criterion above demonstrated before hand-off; linked requirements' acceptance criteria pass.
  • Zero open critical defects, permission gaps or data-integrity regressions at sign-off.

Generated from content/plan/tasks.json by scripts/generate-team-tasks.mjs. Dates are computed by the scheduler (Sunday–Thursday weeks, holidays excluded) — change the plan, not this page.